Rise Academy New Gymnasium
The gym at Rise Academy was a ground up design build construction project. We designed and installed the HVAC and Plumbing systems. Fabric DuctSox were used to to help provide the highest headroom possible in the building.
Raider’s Walk Apartments
As the HVAC contractor on the project, Action Air & Plumbing replaced the heating and coolings systems, and installed new dryer ducting in 196 apartments. We also redesigned, and installed a properly sized water heating system utilizing AO Smith Water heaters, along with a commercial water treatment system.
Lubbock 911 Admin Building
The Lubbock 911 administration building was a ground up engineered project. Designed to house the Lubbock’s emergency communications capibilities, and withstand an F5 tornado. Action Air & Plumbing worked closely with the construction and engineering teams to provide a complete plumbing system on this demanding FEMA project.