Rated 4.9 out of 5 stars ★★★★★ from 111 Google reviews
Lubbock

Projects

Recent Construction Projects

Rise Academy New Gymnasium

The gym at Rise Academy was a ground up design build construction project. We designed and installed the HVAC and Plumbing systems. Fabric DuctSox were used to to help provide the highest headroom possible in the building.

Raider's Walk Apartments

As the HVAC contractor on the project, Action Air & Plumbing replaced the heating and coolings systems, and installed new dryer ducting in 196 apartments. We also redesigned, and installed a properly sized water heating system utilizing AO Smith Water heaters, along with a commercial water treatment system.

Lubbock 911 Admin Building

The Lubbock 911 administration building was a ground up engineered project. Designed to house the Lubbock’s emergency communications capibilities, and withstand an F5 tornado. Action Air & Plumbing worked closely with the construction and engineering teams to provide a complete plumbing system on this demanding FEMA project.

Contact Us

Tiffany Bradley
Tiffany Bradley
Read More
"Very prompt and courteous. Called me an hour before our scheduled window, asking if they could come ahead of time. Upon arrival, they listened to my description of the issue, my questions and concerns, then gave me sound advice. After clearing clogged drain, they stayed behind, cleaning up a mess that wasn’t their fault. They are MY guys from now on."
Kaz Surowiec
Kaz Surowiec
Read More
"Very reliable technicians. After making the appointment they called before coming so I could be ready. They were punctual and knowledgeable. I highly recommend!"
Nathaniel Riley
Nathaniel Riley
Read More
"They were quick and professional. When they ran into a problem, my plumbing is old, they reacted adapted and overcame. Keeping me informed the entire time."